Another Culvert – Road Access on to Housing Site

Start of another culvert for road 2 on the Gaul Road March Site.

You would not believe the amount of soil being dug out, we are 3 metres deep against the road edge.  By the way if you are carrying out this kind of work it would be wise to employ a structural engineer.

After the inspection of the dig he will issue a “permit to work”

First photo shows Alan excavating another 750mm below the slab level.  This will make a total depth from road level to 3.750m.

Saturday 13th February 2016 shutter is being put up, at the same time the steel fixing can be completed.